7330 Frontier Ridge, Mississauga, Ontario, TBD

Verified · Jul 10, 2026
72%

Feasibility in review

Preliminary property verdict

Feasible with conditions

The preliminary review supports a basement suite as the lowest-complexity first phase. Lot dimensions, exact zoning, parking, servicing, and municipal confirmation remain required before final issue.

Verified result · Jul 10, 2026
72%
  • Confirm lot dimensions, exact zoning, parking, and servicing.
  • Validate the final scope with municipal and building professionals.
  • Recheck incentive eligibility when the permit configuration is known.

MV Property Potential · Feasibility

Feasibility review

Basement suite, laneway suite, and duplex addition scenarios for 7330 Frontier Ridge.

Zoning & requirements checklist

RequirementStatusNotes
Zoning designationConfirmed — R4Permits additional residential units by-right.
Lot dimensionsPending surveyAwaiting updated legal survey from client.
Parking requirementMeets minimum2 spaces on existing driveway.
Servicing (water/sewer)Pending municipal reviewCapacity letter requested Jul 8, 2026.
Fire & egressMeets codeSeparate egress confirmed on existing plan.

MV Property Potential · Decision Lab

Project Decision Lab

FRONTIER RIDGE · ROAD ALLOWANCE 7.5 m REAR YARD SETBACK 6.0 m FRONT YARD SETBACK 1.2 m SIDE YARD (TYP.) 21.3 m 34.1 m EXISTING DWELLING PROPOSED DUPLEX ADD'N LANEWAY SUITE BASEMENT SUITE — BELOW GRADE (HIDDEN) N SITE PLAN · CONCEPT 7330 FRONTIER RIDGE · SCALE 1:200 FOR DISCUSSION — NOT FOR CONSTRUCTION
Legend
Duplex addition — above grade
Laneway suite — above grade
Basement suite — below grade

Comparative analysis

ScenarioCost estimatePermit timelineROI
Duplex addition — gold$350,00013 months+23.5%
Laneway suite — bronze$330,00013 months+18.2%
Basement suite — bronze$120,0006 months+25.6%

MV Property Potential · Timeline

Maple Avenue timeline

CURRENT DATE
2026 → 2027
JULAUGSEPOCTNOVDECJANFEBMARAPRMAYJUN
Feasibility review
Design iteration
Municipal submission
Build phase
Milestone checklist

MV Property Potential · Documents

Project documents

Permits
Zoning reports
Architectural sets
Contracts
PDFBuilding permit applicationJul 10, 2026Submitted
PDFZoning reportJul 10, 2026In review
DWGSite plan drawingJul 10, 2026Approved
No preview available.
Select a document to preview.

MV Property Potential · Communication hub

Communication hub

#General-Updates
@Architect-Sarah
@Site-Supervisor-Mike
#General-UpdatesProject
Marcos · 1:35 PM
Hi Sasha, could you share the updated permit status for Maple Avenue?
Sasha · 1:39 PM
Submission went in this morning. Municipal review is typically 2–3 weeks.
Marcos · 7:29 PM
Perfect, thanks. Let's plan the next site visit once that comes back.
Task list from chat